Skip to content
Leithen Lane

Foundations Sprint

Building the retention system rather than planning it. Hands-on work, in your stack, live by the end.

The problem this solves

Knowing what to do is rarely the constraint. Most founders reading this site could write a decent retention plan in an afternoon. The constraint is that the plan competes with fulfilment, support, stock, and everything else that shouts louder, and strategic work loses that fight almost every week.

A sprint exists to get the foundation built during a period when it is somebody's actual job, rather than something you will get to.

What gets built

The three layers from the book, in the order they compound:

  • Onboarding. The first thirty days after a purchase, rebuilt as a deliberate sequence rather than a receipt and a silence. This is where most retention is won.
  • Ongoing engagement. A repeating rhythm of value, milestone, trigger and conversation touchpoints, so you are present without being relentless.
  • Intervention. An at-risk segment that populates itself, and a win-back sequence that fires when a customer exceeds their usual purchase cycle, before they have forgotten you exist.

Plus the measurement underneath it: lifetime value, churn or repeat purchase rate, and a review rhythm you can actually keep to in thirty minutes a week.

How it works

  1. Diagnosis. The same ground as the Health Check, so we build against what is actually happening rather than what should be.
  2. Build. Segments, flows and templates created in your own stack, written in your voice, tested and switched on.
  3. Handover. Documented, so it can be maintained and extended by whoever runs it next, including you.

There are 5 of these a year

A sprint is the one thing here that happens in your stack rather than on this site, and it takes the kind of attention that cannot be divided. So there are 5 in a year, and they run one at a time.

That is not a sales device. It is the arithmetic of building something properly while it is somebody's actual job, which is the entire premise of the offer. If the cap is full when you apply I will tell you so and tell you when the next one opens, rather than starting something I cannot give the time to.

There is no published price, because the honest range is wide. How much of the measurement layer already exists, and how much of a state your current flows are in, move the number more than anything else does. Tell me about the business and you get a figure back within 5 working days.

What it is not

It is not a retainer, and it is not designed to make you dependent on me. Everything built during a sprint is designed to be run by one person afterwards, because that is exactly how it was built the first time at Lean Greens.

Applying

Four things: what you sell, what stack you are on, what you have already tried, and what you want to be true in six months. A paragraph each is plenty.

You get a straight answer within 5 working days, including a price, or a reason a sprint is the wrong shape for what you need. Sometimes that reason is the Health Check, and sometimes it is that you should keep your money.

Apply for a Sprint